Warning: preg_match(): Compilation failed: nothing to repeat at offset 50 in [path]/showthread.php on line 2297

Warning: preg_match(): Compilation failed: nothing to repeat at offset 50 in [path]/showthread.php on line 2298

Warning: preg_replace(): Empty regular expression in [path]/showthread.php on line 2381

Warning: preg_replace(): Empty regular expression in [path]/showthread.php on line 2381

Warning: preg_replace(): Empty regular expression in [path]/showthread.php on line 2381
Reduce Manufacturing Cost , Handling Costs?????How??? - CiteHR

No Tags Found!

SH

Shai89308

Executive Hr

AS

Ammu Shanvi

Human Resource

GS

G SHASHI KRISHNA

Senior Manager - Hr

AH

Aizant HR

Human Resources

MA

MARSHAL

Safety Officer

AK

Anish Katoch

Hr Executive

PR

PranjalR

Hr Recruiter

AP

Alka Pal

Hr Executive

Karthikeyan8195

Management Consultant

MK

Mohit Kumar Puri

Head Marketing

AU

Austex

Accounts Manager


nitin.parijaat
15

Hi Guys
How cani reduce Manufacturing Cost , Handling Costs?????
"An Ideally laid out plant goes a long way in reducing manufacturing costs through reduced material handling , reduced personnel's and equipment requirements and reduced in process inventory" , How ?????
Pls pls help in solvingmy prob !!!!!!!!!!!!
Nitin Parijaat

From India, New Delhi
joseph
Hi Nitin,
In order to reduce cost you should apply the Quality Improvement Concept. The simplest way is to Map the process, and identify the activities that do not add value. There are 9 wastes that we should eliminate from our process:
1. Over production, 2. waiting time, 3. transportation, 4. processing (over processing), 5. Inventory, 6. Motion, 7. Defects, 8. Underutilized manpower, 9. Wrong utilization of resources/manpower.
You can search many articles/ slides under "Just In Time" in any search engine.
Best regards,
Joseph


Rajat Joshi
100

Hi Nitin,

Well i asked my colleague from Production division and he has shared this piece and hope it helps..

Cheers,

Rajat

Strategies to Reduce Manufacturing Costs

Reduce Manufacturing Costs

PROBLEM Unplanned downtime is making it impossible to meet production goals.



STRATEGY Reduce downtime through team awareness of downtime events when they occur. Display downtime for both the event and total accumulated downtime. Once the information is available to those responsible, set goals for reducing it.



SOLUTION Automatically display downtime when the line stops. Use color and context sensitive variable changes to further enhance the awareness. Show a real-time run rate in green and change to the accumulated downtime in red when the line stops.

Reduce Waste by Attacking the Root Causes of Inefficiency

PROBLEM Production efficiency is down due to small stops and reduced speed operation.



STRATEGY Expose inefficiencies caused by small stops and reduced speed operation then attack the root causes. Display key OEE Performance metrics, reduced speed cycles and small stops, so that operators know when events occur.



SOLUTION It is typically very difficult for operators to detect and log small stops and reduced speed cycles. As a result, these issues often get overlooked. Additionally, small stop downtime is often logged in the wrong category when it is logged. The key is to automatically log small stops and reduced speed cycles then provide real-time display of this information.



Increase Productivity with Real-Time Goals

PROBLEM Plant floor employees are informed of production goals when it is too late to act.



STRATEGY Deliver real-time production goal information to the plant floor. Display a shift or job based goal. Additionally the target can be displayed in real-time as a count based on the product takt time. Actual count can also be shown as well as a calculated production efficiency and much more.



SOLUTION People respond to information that tells them where they are and where they should be in relation to production goals. Show the goal count, an actual count, a percent efficiency, pieces to goal, the estimated time to goal, a piece or time variance from goal, OEE Performance and more in any combination



Reduce Changeover Time Through Training and Awareness

PROBLEM Changeover time is hurting production efficiency.



STRATEGY Reduce changeover time significantly through training and awareness. Display the changeover time for all to see. Additionally, by showing a pieces to goal or estimated time to job completion variable aids operators in determining when to initiate internal set-up procedures. Internal set-up or those items which can be handled while running is one of the greatest tools for minimizing changeover time.



SOLUTION Show time to completion by displaying either a pieces to goal count or an estimated time of completion based on the current run speed. Also display the changeover in-process time for all to see. Set goals to reduce the time required and use color-coded data to show the allowed changeover time in green and time overage in red.

From India, Pune
Find answers from people who have previously dealt with business and work issues similar to yours - Please Register and Log In to CiteHR and post your query.




About Us Advertise Contact Us Testimonials
Privacy Policy Disclaimer Terms Of Service

All rights reserved @ 2024 CiteHR ®

All Copyright And Trademarks in Posts Held By Respective Owners.